Tours
CNC Control is disassembled. Circuit boards are removed. Pressure washed. Prepared for painting.
3. Dielectric System.
Remove filters and resin. Acid bath and power wash flush cart. Replace with new filters and resin.
Also, replace mechanical seals in pumps as required.
Home
|
New EDMs
|
Reconditioned EDMs
|
Brokered EDMs
|
Inventory
|
Consumables
|
Parts
|
Our Team
|
Testimonials
|
Tours
|
In The News
|
Specials
|
About Us
|
Contact Us
New CHMER EDMS
|
Reconditioned CHMER EDMs
|
Specialty EDMs
|
Wire EDMs
|
ZNC Sinker EDMs
|
CNC Drilling EDMs