Work tank is removed. Upper and lower
head removed. Machine is pressure-washed
and prepared for painting.
3.
Dielectric System.
Remove
filters and resin. Acid bath and power wash
flush cart. Replace with new filters and
resin.
Also, replace mechanical seals in pumps as required.