|
 |
The
machine arrives and is
initially inspected
and
disassembled for cleaning. |
|
|
|
1. Machine Tool is disassembled down to the table
base riding on the X-Y ways with ball screws exposed.
- Clean
and lube ways and ball screws.
- Remove
U-V covers, expose ways and screws - clean and
lubricate.
- Disassemble
and glass bead upper and lower head pieces -
remove all calcium buildup and oxidation.
- Send
work table out for media blast. Remove arm and
tapering device. Rework auto threader.
- Remove
work tank, send out for Media Blast and powder
coat.
- While
disassembled, strip, clean, prep and paint table
area, machine tool casting and sheet metal panels.
- Reassemble
all components. Realign tapering assembly.
- Rebuild
wire drive assembly.
|
|
|
|
|
|